The efficiency of a lift station can be established long before it is a concrete structure with valves, pumps and piping. Flow calculations, site elevations systems pressure water properties, peak conditions maintenance access, controls and the capacity of the future will all determine the final design of the structure.

Image credit: romtecutilities.com

For project owners comparing the best lift station designers, the more useful question isn’t simply who can specify pumps. It’s not about who can design pumps however, but who can translate location’s requirements and operating conditions into a design that’s easy to construct and operate as well as maintain.

Gravity has its limits

Gravity is often the easiest method of moving wastewater. However, terrain and building patterns can make this difficult. New commercial, residential and industrial developments may be too low, distant, or in places where expanding gravity sewers isn’t feasible.

A lift station will provide the required force mechanically to transport wastewater from one part of the collection system to the next. It is crucial to take into consideration both the standard operating conditions and those that are less efficient, like the high inflows, maintenance of the pump and equipment breakdown, as well as the possibility of future increases in demand.

The top companies in wastewater design must analyze the entire problem rather than only treating the station.

Existing infrastructure makes the task More difficult

Construction of new facilities isn’t the only problem. Numerous municipalities have to modernize or replace their old facilities in order to keep the vital wastewater infrastructures in place.

Wet wells that are in use, force mains, electrical services, controls, site boundaries, and downstream infrastructure could limit the new design. Engineers must decide what is left or replaced, and what must be replaced, and what new components are needed.

Romtec Utilities offers pumping solutions for municipal, private, industrial, commercial and retrofit projects. Pumping systems can be adapted to meet the unique requirements of every project.

Stormwater Has Different Rules

The most effective stromwater system design using the terms used in the search must solve a different hydraulic problem. Stormwater systems are susceptible to massive volume fluctuations based on rainfall and other elements like drainage area as well as the capacity of detention and discharge rate.

A facility that serves a detention basin, for example one, might need to store runoff for a while before pumping it at an appropriate rate. Engineers must take into account flow and head conditions, environmental demands, flood management objectives, and also the features of the receiving drain system.

Prefabrication can be used to transfer the work off site

The difficulty of field assembly may cause problems with scheduling, errors in installation, changes orders, and even delays. Romtec Utilities prefabricates equipment before it arrives at the site of the project.

Making more assembly and quality-control tasks in a controlled environment can decrease the amount construction that is required on the field. Romtec Utilities’ approach to project management can reduce the duration required to set up certain kinds of equipment.

Commitment to engineering success includes the commissioning process.

It’s not enough just to have all the components installed to a system to be considered a reliable one. Romtec Utilities provides installation advisors and also follows up on construction with startup controls, check-points on the control panel and pump operation checks, system testing, and staff training. The manual also contains information that users are able to refer to when they are maintaining the system, or contemplating expansion.

For those looking for the most reputable lift station designers, that final stage deserves attention. The end result of good engineering should be more than a set acceptable sketches. It should leave the proprietor with a functional system and a skilled staff, as well as useful documentation, and equipment built to meet the demands the station will encounter in daily operation.